Check for roadworks and closures
You can view the interactive map to see all roadworks, including roadworks being done by:
- Buckinghamshire Council
- approved utility and contractual works
- emergency works
Using the interactive map
Enter a postcode or zoom into an area on the map that you want to view.
The map will default to show you roadworks currently in progress. Planned works will not appear on the map until they've started.
To see roadworks planned for the future, change the selection in the dropdown menu at the top of the map.
Set up alerts for road works
You can set up alerts on One.Network to let you know about planned road works on routes you regularly take such as your commute to work or the school run.
Our planned road works
View a list of our planned roadworks over the next few weeks below.
There will be no weekend or bank holiday working unless specified.
This list doesn't include all roadworks
This list only shows planned improvements and repairs being made by Buckinghamshire Council.
View the interactive map to see all roadworks, including utility works.
Last updated on Friday 3 July.
| Location | Date | Description of works to be carried out |
|---|---|---|
| Piggots Orchard & Piggots End, Amersham | Wednesday 1 July to Thursday 2 July | Carriageway resurfacing and other ancillary work will be carried out using a road closure, in operation between 07:30 and 19:00 |
| A41 Bicester Road, Ludgershall | Monday 29 June to Tuesday 14 July | Carriageway resurfacing and other ancillary work will be carried out using a road closure, in operation from 7pm to 7am (Monday to Friday only) |
| A41 Bicester Road, Fleet Marston | Monday 29 June to Tuesday 14 July | Carriageway resurfacing and other ancillary work will be carried out using a road closure, in operation from 7pm to 7am (Monday to Friday only) |
| Rowden Farm Lane, Mentmore | Thursday 2 to Saturday 4 July | Plane and patch resurfacing works using a road closure and two-way signals in operation from 8pm to 6am |
| Green Way/Berry Way, Newton Longville | Monday 29 June to Wednesday 15 July | Carriageway surfacing will be carried out using a road closure and 2-way traffic lights at the junction of Whaddon Road, in operation from 7am to 7pm |
| Walton Drive, High Wycombe | Monday 29 June to Wednesday 8 July, then Monday 20 to Wednesday 22 July | Carriageway surfacing will be carried out using a road closure and 2-way traffic lights at the junction of Arnison Avenue, in operation from 7am to 7pm |
| Overn Crescent, Buckingham | Tuesday 30 June to Friday 3 July | Carriageway surfacing will be carried out using a road closure, in operation from 7am to 7pm |
| Russell Avenue, Aylesbury | Tuesday 7 to 10 July, then Thursday 23 to 27 July | Carriageway surfacing will be carried out using a road closure and 2-way traffic lights at the junction of Arnison Avenue, in operation between 7am and 7pm |
| Barbers Wood Close/Barbers Wood Road, High Wycombe | Friday 10 to 13 July, then Wednesday 29 July | Carriageway surfacing will be carried out using a road closure, in operation between 7am to 7pm |
| Orchard Lane, Amersham | Monday 6 to 10 July, then Tuesday 14 to 16 July | Carriageway surfacing will be carried out using a road closure, in operation between 7am to 7pm |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Edgcott Road, Marsh Gibbon Road, Edgcott | Thursday 9 to Tuesday 14 July | Targeted carriageway patching works in advance of the headline treatment taking place later in the summer, will be carried out using a road closure, in operation between 7:30am- 7pm (Monday to Friday) |
| West Street, Steeple Claydon | Sunday 12 to Monday 13 July | The surface dressing treatment will be carried out using a road closure, in operation between 9am to 4pm |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Thame Road , Haddenham | Monday 15 June to Saturday 22 August | Footway reconstruction work will be carried out between 9am to 3pm, utilising multiway traffic signals (Monday to Saturday) |
| Denham Green Lane, Denham Uxbridge | Monday 22 June to Friday 24 July | Footway reconstruction work will be carried out between 7am– 7pm, utilising multiway traffic signals (Monday to Saturday) |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Marlow Suspension Bridge | Monday 3 November 2025 to Tuesday 4 August 2026 |
Structural maintenance work ongoing with the bridge lowered on the new bearings on the south side of the bridge, and work will also continue on the South Pier. These activities will be carried out beneath the bridge. To support the works, parking bays near Higginson Park and Pound Lane Car Park will be temporarily suspended for the duration of the project |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Ibstone Road, Stokenchurch | Monday 6 to Friday 24 July | Safety barrier works using two-way signals in place between 9:30am to 3:30pm |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Countywide column stump replacements | Monday 29 June to Friday 24 July |
As part of a multi-phase programme of street lighting improvements across Buckinghamshire, this programme of work will replace 40 damaged or deteriorated street lighting column stumps across Buckinghamshire. The work will take place in Amersham, Aylesbury, Beaconsfield, Biddlesden, Bourne End, Buckingham, Calvert Green, Chesham, Fairford Leys, Flackwell Heath, Great Horwood, Hazlemere, High Wycombe, Marlow, Princes Risborough and Stoke Poges. The work involves removing the old stumps, installing new columns where needed, and reconnecting power supplies to ensure street lighting remains safe and operational. To carry out the work safely, there will be temporary traffic management at each site, such as traffic lights, lane closures or short-term restrictions. Most work will take place during the day, although some locations may require overnight working. |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Greys Park Rd, Stoke Poges | Monday 29 June to Friday 3 July | Drainage works will be carried out using a lane closure with 24hr two way lights, the actual works will be carried out between 8am to 5pm |
| Location | Date | Description of works to be carried out |
|---|---|---|
| A404 Amersham Road, Junction with Hamilton Road | Monday 22 June to Friday 7 August | Pedestrian crossing and traffic signal upgrade works using a road closure in operation 24/7 |
Five points roundabout, Iver (From Monday 19 January to March 2027)
Traffic management for Five Points Roundabout is a single lane 1 closure on Uxbridge Road west bound (exiting the roundabout.) and the lane 2 closure on Uxbridge road approaching the roundabout either side and the inner ring of the Five Points Roundabout, with two way traffic still flowing.
Some activities are weather dependent and dates are subject to change at short notice.
These dates may also be subject to change depending on the availability of materials and unforeseen circumstances out of our control. We apologise in advance for any inconvenience caused.
Road worker abuse has increased in recent years – ensure you respect our workforce while they make improvements to Buckinghamshire Highways.
If roadwork signs have been left behind
If roadworks have finished but there is some signage that has been left behind at the site, report the location of the signs on FixMyStreet.