Check for roadworks and closures
You can view the interactive map to see all roadworks, including roadworks being done by:
- Buckinghamshire Council
- approved utility and contractual works
- emergency works
Using the interactive map
Enter a postcode or zoom into an area on the map that you want to view.
The map will default to show you roadworks currently in progress. Planned works will not appear on the map until they've started.
To see roadworks planned for the future, change the selection in the dropdown menu at the top of the map.
Set up alerts for road works
You can set up alerts on One.Network to let you know about planned road works on routes you regularly take such as your commute to work or the school run.
Our planned road works
View a list of our planned roadworks over the next few weeks below.
There will be no weekend or bank holiday working unless specified.
This list doesn't include all roadworks
This list only shows planned improvements and repairs being made by Buckinghamshire Council.
View the interactive map to see all roadworks, including utility works.
Last updated on Friday 26 June.
| Location | Date | Description of works to be carried out |
|---|---|---|
| Piggots Orchard & Piggots End, Amersham | Wednesday 1 July to Thursday 2 July | Carriageway resurfacing and other ancillary work will be carried out using a road closure, in operation between 07:30 and 19:00 |
| A41 Bicester Road, Ludgershall | Monday 29 June to Tuesday 14 July | Carriageway resurfacing and other ancillary work will be carried out using a road closure, in operation from 7pm to 7am (Monday to Friday only) |
| Rowden Farm Lane, Mentmore | Thursday 2 to Saturday 4 July | Plane and patch resurfacing works using a road closure and two-way signals in operation from 8pm to 6am |
| Green Way/Berry Way, Newton Longville | Monday 29 June to Wednesday 15 July | Carriageway surfacing will be carried out using a road closure and 2-way traffic lights at the junction of Whaddon Road, in operation from 7am to 7pm |
| Walton Drive, High Wycombe | Monday 29 June to Wednesday 22 July | Carriageway surfacing will be carried out using a road closure and 2-way traffic lights at the junction of Arnison Avenue, in operation from 7am to 7pm |
| Overn Crescent, Buckingham | Tuesday 30 June to Friday 3 July | Carriageway surfacing will be carried out using a road closure, in operation from 7am to 7pm |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Station Road, Mursley | Monday 29 June to Tuesday 30 June | Targeted carriageway patching works in advance of the headline treatment taking place later in the summer, will be carried out using a road closure, in operation between 7:30am- 7pm (Monday to Friday) |
| Sandhill Road, Claydon Hill | Wednesday 1 July to Thursday 2 July | Targeted carriageway patching works in advance of the headline treatment taking place later in the summer, will be carried out using a road closure, in operation from 7:30am to 7pm (Monday to Friday) |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Thame Road , Haddenham | Monday 15 June to Saturday 22 August | A Footway reconstruction work will be carried out from 9am to 3pm, utilising multiway traffic signals |
| Denham Green Lane, Denham Uxbridge | Monday 22 June to Friday 24 July | Footway reconstruction work will be carried out between 7am– 7pm, utilising multiway traffic signals (Monday to Saturday) |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Marlow Suspension Bridge | Monday 3 November 2025 to Tuesday 4 August 2026 |
Structural maintenance work ongoing with the bridge lowered on the new bearings on the south side of the bridge, and work will also continue on the South Pier. These activities will be carried out beneath the bridge. To support the works, parking bays near Higginson Park and Pound Lane Car Park will be temporarily suspended for the duration of the project |
| Risborough Rd, Little Kimble | Wednesday 1 July to Thursday 2 July | The sign replacement works will be carried out on the railway bridge using a road closure, in operation between 9:30am to 3:30pm |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Greys Park Rd, Stoke Poges | Monday 29 June to Friday 3 July | Drainage works will be carried out using a lane closure with 24hr two way lights, the actual works will be carried out between 8am to 5pm |
| Location | Date | Description of works to be carried out |
|---|---|---|
| A404 Amersham Road, Junction with Hamilton Road | Monday 22 June to Friday 7 August | Pedestrian crossing and traffic signal upgrade works using a road closure in operation 24/7 |
Five points roundabout, Iver (From Monday 19 January to March 2027)
Traffic management for Five Points Roundabout is a single lane 1 closure on Uxbridge Road west bound (exiting the roundabout.) and the lane 2 closure on Uxbridge road approaching the roundabout either side and the inner ring of the Five Points Roundabout, with two way traffic still flowing.
Some activities are weather dependent and dates are subject to change at short notice.
These dates may also be subject to change depending on the availability of materials and unforeseen circumstances out of our control. We apologise in advance for any inconvenience caused.
Road worker abuse has increased in recent years – ensure you respect our workforce while they make improvements to Buckinghamshire Highways.
If roadwork signs have been left behind
If roadworks have finished but there is some signage that has been left behind at the site, report the location of the signs on FixMyStreet.