Check for roadworks and closures
You can view the interactive map to see all roadworks, including roadworks being done by:
- Buckinghamshire Council
- approved utility and contractual works
- emergency works
Using the interactive map
Enter a postcode or zoom into an area on the map that you want to view.
The map will default to show you roadworks currently in progress. Planned works will not appear on the map until they've started.
To see roadworks planned for the future, change the selection in the dropdown menu at the top of the map.
Our planned road works
View a list of our planned roadworks over the next few weeks below.
There will be no weekend or bank holiday working unless specified.
This list doesn't include all roadworks
This list only shows planned improvements and repairs being made by Buckinghamshire Council.
View the interactive map to see all roadworks, including utility works.
Last updated on Friday 20 June.
Location | Date | Description of works to be carried out |
---|---|---|
Winslow Road, Swanbourne | Wednesday 18 June to Thursday 26 June | Carriageway resurfacing works using a road closure in operation between 7:30am to 5pm |
Location | Date | Description of works to be carried out |
---|---|---|
Stylecroft Road/Valentine Way/The Brow, Chalfont St Giles | Thursday 26 June to Friday 27 June | Carriageway resurfacing works using a road closure in operation between 7am to 7pm |
Location | Date | Description of works to be carried out |
---|---|---|
Rose Drive, Eunice Grove, Kesters Road and Cavnedish Road, Chesham | Monday 23 June to Monday 21 July |
Preparation and civils work (including kerb repairs): 23 June and 14 July using give and take, in operation Monday to Friday between 7am to 7pm. Carriageway resurfacing works: 15 July and 21 July using a road closure, in operation Monday to Friday between 7am to 7pm. |
Windrush Drive, High Wycombe | Wednesday 25 June to Monday 7 July | Carriageway resurfacing works using a road closure in operation between 7am to 7pm |
Location | Date | Description of works to be carried out |
---|---|---|
A40 Frances Dove Way, High Wycombe | Monday 23 June to Wednesday 25 June | Capital Road Lining (Refresh existing road markings) using a road closure in operation between 8pm to 6am |
Wycombe Road, Marlow | Wednesday 25 June to Thursday 26 June | Capital Road Lining (Refresh existing road markings) using a road closure in operation between 8pm to 6am |
Havelock Street, Fleet Street and Crown Leys, Aylesbury | Tuesday 24 June to Wednesday 25 June | Capital Road Lining (Refresh existing road markings) using a road closure in operation between 9am to 5pm |
Location | Date | Description of works to be carried out |
---|---|---|
Winslow Road, Swanbourne | Wednesday 18 June to Thursday 26 June | Carriageway resurfacing works using a road closure in operation between 7:30am to 5pm |
Location | Date | Description of works to be carried out |
---|---|---|
Chapel Road Culvert, Aylesbury | Friday 30 May to Monday 7 July | Ford refurbishment using a road closure on the weekends in operation from Friday 8pm to Monday 6am |
Location | Date | Description of works to be carried out |
---|---|---|
Elmhurst road, Aylesbury | Monday 9 June to Friday 18 July | Footway reconstruction using traffic lights in operation between 9.30am to 3pm |
Location | Date | Description of the works |
---|---|---|
Straight Bit, Flackwell Heath | Monday 23 June to Thursday 26 June | Carriageway resurfacing works using a road closure in operation between the hours of 8pm to 6am |
Holtspur Lane, Wooburn Green | Wednesday 25 June to Tuesday 1 July | Carriageway resurfacing works using a road closure in operation between the hours of 8pm to 6pm |
Location of works | Date | Description of works to be carried out |
---|---|---|
Countywide structural and electrical testing | Tuesday 27 May to Thursday 31 July | Replacement of streetlighting columns across the county and electrical testing |
Location | Date | Description of works to be carried out |
---|---|---|
A40 / A4010 Pedestal Roundabout, West Wycombe | Monday 23 June to Friday 4 July | Replacement of traffic signals and CCTV camera, using multi-way signals in operation between the hours of 9:30am to 3:30pm |
Location of works | Date | Description of works to be carried out |
---|---|---|
Rocky Lane, Wendover | until Monday 18 August | Road closure of Rocky Lane with a signposted diversion route, various activities around the perimeter of Rocky Lane. |
A413 London Road, Wendover | Wednesday 25 June to Friday 27 June - overnight road closures 8:30pm to 5:30am | Construction at the Small Dean Viaduct including, lifting precast concrete segments, pouring the bottom slab of the viaduct and installing the viaduct parapets. Overnight road closures will be in place to prevent the risk of concrete dripping onto the road, and the lifting of the parapets directly above the A413. |
Some activities are weather dependent and dates are subject to change at short notice.
These dates may also be subject to change depending on the availability of materials and unforeseen circumstances out of our control. We apologise in advance for any inconvenience caused.
Road worker abuse has increased this year – please respect our workforce while they make improvements to Buckinghamshire Highways
If roadwork signs have been left behind
If roadworks have finished but there is some signage that has been left behind at the site, report the location of the signs on FixMyStreet.