Check for roadworks and closures
Check current and planned roadworks and road closures across Buckinghamshire.
The map includes works carried out by Buckinghamshire Council, utility companies and emergency contractors.
Help using the map
Search by postcode or zoom in to an area.
Use the dropdown menu to switch between current and planned roadworks. Planned works will not appear until they have been scheduled.
Roadwork alerts
You can set up alerts on One.Network to let you know about planned road works on routes you regularly use, such as your commute or school run.
Planned roadworks
View Buckinghamshire Council's planned roadworks and repairs scheduled over the coming weeks.
This list does not include utility company works. For all current and planned roadworks, use the interactive map.
There will be no weekend or bank holiday working unless specified.
Last updated on Friday 16 October.
| Location | Date | Description of works to be carried out |
|---|---|---|
| Addington Estates Road, Addington | Friday 9 October to Monday 19 October | Carriageway surfacing will be carried out using a road closure, in operation between 8am to 5pm Monday to Friday |
| Tring Road, Aylesbury, Phase 1 | Monday 12 October to Friday 17 October | Carriageway civils work using a 24/7 lane closure of the westbound carriageway, under contraflow |
| Tring Road, Aylesbury, Phase 2 | Monday 19 October to Tuesday 3 November | Carriageway resurfacing using a road closure in operation between 7pm to 7am daily |
| Glebe Road, Chalfont St Peter | Tuesday 20 October to Wednesday 21 October | Carriageway resurfacing under a road closure. 8am to 5pm. |
| A413 Nash Lee and London Road, Wendover Bypass | Thursday 22 October to Wednesday 28 October | Carriageway resurfacing under a road closure. 7pm to 7am. |
| Location | Date | Description of works to be carried out |
|---|---|---|
| West Wycombe Road, High Wycombe | Friday 16 October to Monday 19 October | Ironworks using two-way temporary traffic lights and stop/go boards. 9:30am to 3:30pm. |
| White Lion Road, Little Chalfont | Monday 19 October to Wednesday 21 October | Ironworks using stop/go boards. 9:30am to 3:30pm. |
| Hampden Road, Aylesbury | Thursday 22 October | Ironworks under a road closure. 7am to 7pm. |
| Location | Date | Description of works to be carried out |
|---|---|---|
| High Street, Prestwood | Monday 5 October to Saturday 24 October | Footway reconstruction under a lane closure with traffic lights. 9:30am to 3:30pm. |
| Langdon Avenue and Ballard Close, Aylesbury | Monday 12 October to Saturday 12 December | Footway reconstruction under a footway closure and diversion. 7am to 7pm. |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Lower Icknield Way, Little Kimble | Wednesday 21 October to Friday 23 October | Road sign replacement works using two-way signals. 9:30am to 3:30pm. |
| Bridgeway, Cuddington, Aylesbury | Monday 28 September to Friday 23 October | Scour investigation works with 24-hour two-way traffic lights. |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Pinewood Road, Iver | Monday 19 October to Thursday 22 October | Electrical and VAS sign installation under two-way lights. 9:30am to 3:30pm. |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Countywide damaged street lighting asset replacements | Monday 28 September to Monday 7 December |
As part of a multi-phase programme of street lighting improvements across Buckinghamshire, this programme of work will replace 13 damaged street lighting assets with new columns and energy-efficient LED lanterns. The latest phase of this work will take place in Amersham, Aylesbury, Beaconsfield, Buckingham, Chesham, Downley, Halton, High Wycombe & Penn. |
| Countywide LED Lantern Replacements | Monday 28 September to Friday 23 October |
As part of a multi-phase programme of street lighting renewals across Buckinghamshire, 202 lights will be upgraded with new, more energy-efficient LED lanterns, replacing older units. The work will take place in Amersham, Little Chalfont, Beaconsfield, Farnham Royal, Farnham Common, Denham and Haddenham. |
This programme of work is now mostly complete, with a small number of locations to be completed
| Location | Date | Description of works to be carried out |
|---|---|---|
| A413 Tatling End to Chalfont St Peter | Monday 12 October to Friday 30 October | Drainage investigation and maintenance works with 24-hour lane closures. 7:30am to 5:30pm. |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Zebra and pedestrian crossing refresh programme | Monday 12 October to Saturday 31 October | Zebra and pedestrian crossings to be refreshed across the county. Lining to carried out under road closures – works to be carried out overnight between 8pm and 6am (Monday – Saturday) |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Buckingham Railway Walk Active Travel Scheme | Monday 5th October 2026 to Friday 19th February 2027 | Installation of a pedestrian crossing and active travel improvements at Meadway, Tingewick Road and along sections of Railway Walk, including the area around Berties Walk in Buckingham. Works include a new pedestrian crossing at Meadway, a new toucan crossing on Tingewick Road, and improvements to the shared-use path along Railway Walk. Traffic management will vary throughout the programme and will include temporary traffic signals, lane closures and restricted access to Berties Walk during certain phases of the works |
Five points roundabout, Iver (From Monday 19 January to March 2027)
Traffic management for Five Points Roundabout is a single lane 1 closure on Uxbridge Road west bound (existing the roundabout.) and lane 2 closure on Uxbridge Road approaching the roundabout, either side and the inner ring of the Five Points Roundabout, with two way traffic still flowing. Also temporary 2-way lights on Wood Lane.
Some activities depend on weather conditions and dates may change at short notice.
Dates may also change because of material availability or other circumstances beyond our control.
Roadwork signs left behind
If roadworks have finished but signs remain at the site, report their location using FixMyStreet.
Respect our workforce
Road worker abuse has increased in recent years.
Please respect our workforce while they carry out improvements to Buckinghamshire's highways network.