Check for roadworks and closures
Check current and planned roadworks and road closures across Buckinghamshire.
The map includes works carried out by Buckinghamshire Council, utility companies and emergency contractors.
Help using the map
Search by postcode or zoom in to an area.
Use the dropdown menu to switch between current and planned roadworks. Planned works will not appear until they have been scheduled.
Roadwork alerts
You can set up alerts on One.Network to let you know about planned road works on routes you regularly use, such as your commute or school run.
Planned roadworks
View Buckinghamshire Council's planned roadworks and repairs scheduled over the coming weeks.
This list does not include utility company works. For all current and planned roadworks, use the interactive map.
There will be no weekend or bank holiday working unless specified.
Last updated on Friday 25 September.
| Location | Date | Description of works to be carried out |
|---|---|---|
| Blackgrove Road, Waddesdon - Phase 2 | Monday 28 September to Thursday 8 October | Carriageway surfacing will be carried out using a road closure from 7am to 7pm Monday to Friday only |
| Addington Estates Road, Addington - Phase 1 | Monday 28 September to Friday 2 October | Civil works will be carried out using a road closure, in operation between 8am and 5pm Monday to Friday |
| Addington Estates Road, Addington - Phase 2 | Friday 9 October to Monday 19 October | Carriageway surfacing will be carried out using a road closure, in operation between 8am and 5pm Monday to Friday |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Grove Road, Beaconsfield | Monday 28 September to Friday 2 October | The ironworks will be carried out using a combination of stop & go boards and two-way lights, in operation between 7am to 7pm |
| Berwick Road, Marlow | Friday 2 October to Thursday 8 October | The ironworks will be carried out using a combination of stop & go boards and two-way lights, in operation between 7am to 7pm Monday to Friday |
| Location | Date | Description of works to be carried out |
|---|---|---|
| A4010 Wycombe Road, Saunderton | Monday 28 September to Wednesday 30 September | Carriageway road markings carried out using a road closure, in operation between 8pm to 6am |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Denham Green Lane, Denham | Monday 21 September to Saturday 3 October | Footway reconstruction under a lane closure with traffic lights, work will be carried out between 7am to 7pm (Monday to Saturday) |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Marlow Suspension Bridge |
Monday 3 November 2025 to Friday 2 October (Overnight road closures from Monday 28 September to Friday 2 October, 8pm to 6am) |
Structural maintenance and snagging works are ongoing with the bridge now lowered onto the newly installed bearings. These activities will be undertaken beneath the bridge and are expected to continue for the duration of the project. To facilitate the works, a number of parking bays adjacent to Higginson Park and Pound Lane Car Park will be temporarily suspended throughout the construction period. |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Bridgeway, Cuddington, Aylesbury | Monday 28 September to Wednesday 21 October |
Scour investigation works, Monday 28 September road closed between 9am to 3pm, with two way traffic lights outside of these hours 29 September until 12 October 24/7 two way traffic lights |
| Location | Date | Description of works to be carried out |
|---|---|---|
| Countywide LED Lantern Replacements | Monday 28 September to Friday 23 October |
As part of a multi-phase programme of street lighting renewals across Buckinghamshire, 202 lights will be upgraded with new, more energy-efficient LED lanterns, replacing older units. The work will take place in Amersham, Little Chalfont, Beaconsfield, Farnham Royal, Farnham Common, Denham and Haddenham. |
| Countywide column stump replacements | Monday 29 June to Thursday 15 October |
As part of a multi-phase programme of street lighting improvements across Buckinghamshire, this programme of work will replace 40 damaged street lighting assets with new columns and energy-efficient LED lanterns. The work will take place in Amersham, Aylesbury, Beaconsfield, Biddlesden, Bourne End, Buckingham, Calvert Green, Chesham, Fairford Leys, Flackwell Heath, Great Horwood, Hazlemere, High Wycombe, Marlow, Princes Risborough and Stoke Poges. |
This programme of work is now mostly complete, with a small number of locations to be completed
| Location | Date | Description of works to be carried out |
|---|---|---|
| Capital Lining Refresh (Countywide) | Monday 17 August to Friday 16 October |
As part of a countywide road-marking programme across Buckinghamshire, worn road markings will be refreshed and reinstated where required to help maintain visibility and safety for all road users. The programme includes the renewal of road markings such as centre lines, give way markings, road studs, high friction surfacing, lane markings and other carriageway markings that have deteriorated through normal wear and tear. Works will take place at various locations across Buckinghamshire, including Aylesbury, Buckingham, Beachampton, High Wycombe, Wing, Amersham and various other highly frequented roads across the county. As part of a countywide road-marking programme across Buckinghamshire, worn road markings will be refreshed and reinstated where required to help maintain visibility and safety for all road users. The programme includes the renewal of road markings such as centre lines, give way markings, road studs, high-friction surfacing, lane markings and other carriageway markings that have deteriorated through normal wear and tear. Works will take place at various locations across Buckinghamshire, including Aylesbury, Buckingham, Beachampton, High Wycombe, Wing and Amersham, as well as on various other heavily used roads across the county. Traffic management measures will vary depending on the site. Some road closures will be necessary to install the road markings; however, works will be carried out at night to minimise disruption where possible. |
Five points roundabout, Iver (From Monday 19 January to March 2027)
Traffic management for Five Points Roundabout is a single lane 1 closure on Uxbridge Road west bound (existing the roundabout.) and lane 2 closure on Uxbridge Road approaching the roundabout, either side and the inner ring of the Five Points Roundabout, with two way traffic still flowing. Also temporary 2-way lights on Wood Lane.
Some activities depend on weather conditions and dates may change at short notice.
Dates may also change because of material availability or other circumstances beyond our control.
Roadwork signs left behind
If roadworks have finished but signs remain at the site, report their location using FixMyStreet.
Respect our workforce
Road worker abuse has increased in recent years.
Please respect our workforce while they carry out improvements to Buckinghamshire's highways network.