Denham Link and Colne Valley Link active travel routes

About the proposed improvements

The Denham Link and Colne Valley Link are proposed new walking, cycling and wheeling routes in the Denham area.

It will connect Higher Denham, Denham Green and Denham Village.

The proposed route is 4.5km long.

It will form part of the strategic vision for a Greenway across Buckinghamshire, forming the southern-most part.

The proposed route would be 2.5km long and a continuous, safe and accessible route between Denham Station and Denham Green.

At this stage, Phase 1 of the route is proposed.

Phase 1 is 850m in length and aims to improve walking, cycling and wheeling infrastructure between Denham Station and Denham Green.

The route will join with the proposed Denham Link.

Benefits of the routes

The Denham Valley Link aims to create safer, more convenient connections between Denham villages and to make active travel easier and attractive for everyday journeys.

It will:

  • serve the train stations Denham Station and Denham Golf Club Station
  • link with National Cycle Network 5 (NCN) on the Grand Union Canal
  • provide onward connectivity into New Denham, Uxbridge, Heathrow and Greater London
  • link to Denham Country Park

The proposal includes:

  • raised table junctions
  • raised table informal crossings
  • signalised walking and cycling crossings
  • path resurfacing
  • segregated walking and cycling paths

The Colne Valley Link proposal includes:

  • upgrades to shared-use paths
  • crossing enhancements
  • intersection with the Denham Link scheme, helping to complement each other

How the project is being funded

The proposed links are being funded by the Department for Transport.

What happens next

We'll open a public consultation at the end of November. We'll add the details here.

If you have any questions