Register of Temporary Traffic Regulation Orders (TTROs) on rights of way
Temporary Traffic Regulation Orders (TTRO) are closures or restrictions to:
- roads
- footpaths
- cycleways
- bridleways
They are necessary if works are being carried out that could be a danger to the public.
| Road number | Local community area | Section works | Work | Start | Finish |
|---|---|---|---|---|---|
| The Buckinghamshire County Council (Byways Open to All Traffic Nos. 7 and 8, Parish of Princes Risborough) (Prohibition of Driving) Order | Princes Risborough | Byways Open to All Traffic Nos. 7 and 8 Princes Risborough | Annual Prohibition of Driving Order | 1 November to 31 December, 1 January to 30 April inclusive each year | 30 April each year |
| The Buckinghamshire County Council (Byway Open to All Traffic No. 92, Parish of Bledlow-cum-Saunderton) (Prohibition of Driving) Order | Bledow-cum-Saunderton | Byway Open to All Traffic No. 92 Bledlow-cum-Saunderton | Annual Prohibition of Driving Order | 1 November to 31 December, 1 January to 30 April inclusive each year | 30 April each year |
| The Buckinghamshire Council (Byways Open to All Traffic No. 40 and 40A, Great and Little Kimble and Byway Open to All Traffic No. 62 Ellesborough) (Prohibition of Motor Vehicles) Order | Great & Little Kimble and Ellesborough |
BOAT No. 40 and 40A Great & Little Kimble BOAT No. 62 Ellesborough |
Annual Prohibition of Motor Vehicles Apply for a permit |
All year each year | |
| Public Footpath No. 2 Stoke Poges | Stoke Poges | From Muddy Lane to the junction with Fir Tree Avenue | Public Safety due to the approved development. | 22 January 2021 | 14 October 2026 |
| Public Footpath No. 19 Haddenham | Haddenham | From a point approximately 33 metres from Rosemary Lane to a point approximately 200 metres northwest. | New Housing Development | 23 May 2022 | 30 November 2026 |
| Public Footpath No. 7 Chalfont St Peter | Chalfont St Peter | Length of Public Footpath No.7/5 Parish of Chalfont St Peter, which commences at the junction with Public Footpath No's 7/2 and 7/3 Parish of Chalfont St Peter and continues east to the junction of Footpath 7/5 and Shire Lane. | Development for new housing estate | 28 February 2025 | 28 August 2027 |
| Public Footpath No. 44, Great Missenden | Great Missenden | Length of Public Footpath No. 44, Great Missenden, from a point 280 metres north, north-east of its junction with Public Footpath No. 46, Great Missenden to a point 41 metres south of its junction with Public Footpath No. 45, Great Missenden | The closure is required in the interests of public safety due to the poor condition of the path surface. | 12 August 2022 | 1 November 2027 |
| Public Footpath No.17 Stoke Mandeville | Stoke Mandeville |
Length of Public Footpath No. 17, Stoke Mandeville, for a distance of approximately 50 metres either side of the level crossing. |
The Closure is required to accommodate HS2 realignment of the Princes Risborough Line. | 19 August 2023 | 22 July 2026 |
| Stoke Mandeville Footpath Nos.16 & 17, Stoke Mandeville | Stoke Mandeville |
Public Footpath No.16, Stoke Mandeville, from the junction of Public Footpath No.18, Stoke Mandeville to the junction of Public Footpath No.4, Stoke Mandeville. And from Public Footpath No.17, Stoke Mandeville, from the junction of Public Footpath No.16, Stoke Mandeville, to the junction of Public Footpath No.4, Stoke Mandeville. |
South East Aylesbury Link Road | 25 March 2024 | 22 July 2026 |
| Public Footpath No.3 Stoke Mandeville | Stoke Mandeville |
Public Footpath No.3, Stoke Mandeville, from the junction of Public Footpath No.2, Stoke Mandeville, north west for approximately 631 metres to the junction with the Hospital. |
The closure is required to allow for works to proceed in connection with the approved South East Aylesbury Link Road. The alternative is from hospital closure point: 396m west along SMA/3/1 to junction with B4443, 625m southeast along B4443, 225m east along SMA/2/1, West to lower road to pick up existing footpath Lower Road. |
15 July 2024 | 1 November 2026 |
| Public Footpath No.2, Stoke Mandeville | Stoke Mandeville | Public Footpath No. 2/2 and 2/3 Parish of Stoke Mandeville, which commences at the level crossing and continues either side of the level crossing for the length of approximately 35 metres. |
The closure is required to allow for works to proceed in connection with the approved South East Aylesbury Link Road (bridge construction over the railway). The alternative route whilst the closure is effective is via existing highway and Public Bridleway No.1, parish of Stoke Mandeville. |
5 August 2024 | 7 October 2026 |
| Public Bridleway No.7, Parish of Denham | Denham |
Length of Public Bridleway No. 7/1, Parish of Denham, which commences at the junction with Broken Gate Lane and continues east, then north for the length of approximately 275 metres. |
Public Safety due to erosion | 27 April 2025 | 26 October 2026 |
| Public Bridleway No.79, Parish of Bledlow Cum Saunderton | Bledlow Cum Saunderton |
Length of Public Bridleway No. 79/2, Parish of Bedlow Cum Saunderton, which commences at the junction with West Lane and continues south to the junction of Icknield. |
Public Safety due to failed surface | 7 March 2025 | 7 September 2026 |
|
Public Footpath No.17, Parish of Drayton Beauchamp |
Drayton Beauchamp | Public Footpath commencing at the junction of Drayton Beauchamp Footpath No. 17/1 and Icknield Way and continues north west for approximately 310 metres. | The closure is required whilst development takes place in the interest of public safety. | 31 May 2025 | 31 December 2026 |
| Public Footpath No.16, Parish of Grendon Underwood | Grendon Underwood |
Public Footpath No.16, Grendon Underwood commencing at Grendon Road and continues south east for approximately 118 metres to the junction opposite Park Road. |
The closure is required allow for works to proceed in connection with approved development (21/02851/AOP). |
1 September 2025 | 1 March 2028 |
| Public Footpath No.17, Parish of Grendon Underwood | Grendon Underwood |
Public Footpath No.17, Parish of Grendon Underwood commencing at the junction of Public Footpath No.11, Parish of Edgcott south for approximately 415 metres. |
The closure is required allow for works to proceed in connection with approved development (21/02851/AOP). |
1 September 2025 | 1 March 2028 |
| Public Footpath No.1, Parish of Dorney | Dorney |
Public Footpath No.1 Parish of Dorney, for the length of the path over the bridge over the Jubilee River, which commences at the junction with public footpath No. 5/3 to the junction with public footpath No. 5/2 for approximately 145 metres. |
The closure is required in the interest of public safety due to damage to the footbridge which is a risk to public users. | 2 July 2025 | 23 January 2028 |
| Public Footpath No. 25, Parish of Denham | Denham |
Length of Public Footpath commencing at the junction of Denham roundabout and DEN 25/1 and continues south then east for approx. 350M. |
The closure is required whilst works are being carried out for the construction of an Access Road to the approved development of Uxbridge Moor Substation. |
18 August 2025 | 21 December 2029 |
| Public Footpath No.42, Parish of Amersham | Amersham |
Length of Public Footpath commencing at the junction of AMS FP 42/3 and School Road and continues north east to the junction of 42/2 and Hervines Road. |
The closure is required to enable urgent safety works on the railway. | 19 February 2026 | 19 August 2026 |
| Public Footpath No.148, High Wycombe | Wycombe | Length of Public Footpath commencing at the junction of HWU FP 148/1 & Glynswood and continues north for approximately 150 metres. | The closure is required to enable the widening of the Public Footpath to 3 metres. | 10 September 2025 | 30 June 2026 |
| Public Footpath Nos. 16 & 17, Parish of Iver | Iver | Length of Public Footpath No.16 from the junction of Public Footpath No.16/5 north, north west for approximately 50 metres. Public Footpath No.17 from the junction of Public Footpath No.16/5 west south west for 100 metres. | The Closure is required whilst works are being carried out to reconstruct the bridge over the canal. | 7 April 2025 | 7 October 2026 |
| Ouse Valley Way Bridge | Thornton | Section of Road between Ouse Valley Way Bridge, Thornton | Bridge Repairs | 14 October 2025 | 31 May 2026 |
| Royal Borough of Windsor and Maidenhead, Temple Footbridge, Hurley | Hurley | Temple Footbridge, Hurley for its entire length. | Health and Safety Concerns | 29 September | To be confirmed. |
|
Public Bridleway No.8, Parish of North Marston and Public Bridleway No.16, Parish of Oving |
North Marston and Oving | Public Bridleway No. 8/1 Parish of North Marston and 16/1 & 16/2 Parish of Oving from the junction of Public Bridleway No. 8/1, North Marston and Marston fields Road, travelling east for the entire length including Public Bridleways No’s, 16/1 & 16/2 Oving, up to the junction of Public Bridleway No’s, 16/2 & 10/3, Oving. | The closure is required in the interest of public safety whilst the water main renewal scheme takes place. | 26 January 2026 | 26 July 2026 |
| Public Footpath No.149, High Wycombe | High Wycombe | Public Footpath No. 149/1 commencing from the junction of HWU/71(F)/1 and HWU/149/1 continuing east for approximately 135 metres. | The closure is required in the interest of public safety to enable development and maintaining power to the Wycombe Hospital. | 5 January 2026 | 5 July 2026 |
|
Public Footpath No.50, Parish of Whitchurch and Public Footpath No.2, Parish of Aston Abbotts |
Whitchurch & Aston Abbotts | Length of Public Footpath No.50, Parish of Whitchurch & No.2, Parish of Aston Abbotts, which commences at the junction with Bushmead Road and WHI/50 and continues east to the junction of AAB/2 and ABB/1. | Failed Bridge | 8 January 2026 | 29 July 2026 |
| Public Bridleway No.5, Parish of Longwick Cum Ilmer | Longwick Cum Ilmer | Length of Public Bridleway No.5/1, Parish of Longwick-cum-Ilmer, from the junction of Public Bridleway No’s. LCI/7/1 & LCI/5/1 and continuing along the whole length of LCI/5/1 then proceeding over the railway line for approximately 145 metres to the junction with Walnut Tree Lane. | Improving Surface | 22 January 2026 | 22 July 2026 |
| Public Bridleway No.32, Parish of Iver | Iver | Public Bridleway No. 32/1, Parish of Iver commencing at the junction of IVE/33/4, IVE/5/1 & IVE/32/1 and continuing north for approximately 477 metres to the M25 Bridge. | Public safety to enable temporary access for the construction of Uxbridge Moor Substation | 1 February 2026 | 1 August 2026 |
| Public Footpath No.3, Parish of Wingrave | Wingrave | Length of Public Footpath No.3, Parish of Wingrave, which commences at the junction with WIG/3/1 and WIG/3/2 and continues south east for approximately 1075 metres, to the county boundary | Failed Bridge | 4 February 2026 | 4 August 2026 |
| Public Footpath No.2, Parish of Penn | Penn | Length of Public Footpath No. 2/1, commencing at New Road and continuing Northwest for approximately 150 metres. |
Public Safety due to maintenance of surface for management access |
2 February 2026 | 2 July 2026 |
| Public Footpath No.1 & No.23, Parish of Marlow | Marlow | TBC | Marlow Town Regatta | 10 June 2026 | 15 June 2026 |
|
Public Footpath No.17, Parish of Haddenham and Public Footpath No.1, Parish of Kingsey |
Haddenham & Kingsey | Public Footpath No.17/1, Parish of Haddenham & Public Footpath No.1/3, Parish of Kingsey, which commences at Flint Street and HAD/17/1 and continues south to the junction with KIN/1/2, 2/1 & 1/3. | Public Safety due to a damaged bridge unsafe for use. | 11 March 2026 | 1 October 2026 |
| Public Bridleway No.2, Parish of Buckland | Buckland | Public Bridleway No. 2/1, Parish of Buckland, which commences at BLD BW 1/1 to County Border. | The closure is required in the interest of public safety due to damaged bridge unsafe for use. | 11 March 2026 | 1 October 2026 |
| Public Footpath No.35, Parish of Chalfont St Giles | Chalfont St Giles | Public Footpath No. 35/1, commencing at Ivy House, Public House and continuing southeast for approximately 200 metres. | The closure is required in the interest of public safety whilst construction takes place. | 30 March 2026 | 30 September 2026 |
| Public Footpath No.12, Parish of Hazlemere | Hazlemere | Public Footpath No.12/1, commencing at Penn Road and continuing northeast fronting Penn Road Cemetery. | Public Safety to allow repairs at the location to excavate and locate all missing fittings. | 18 May 2026 | 18 November 2026 |
| Public Footpath No.3, Parish of Great and Little Kimble | Great and Little Kimble | Public Footpath No. 3/1, commencing at the junction with Bridge Street to a point approximately 85 metres south west of the junction with Bridge Street. | The closure is required in the interest of public safety due to steps failing. | 12 March 2026 | 2 October 2026 |
| Public Footpath No.29B, Parish of Great and Little Kimble | Great and Little Kimble | Public Footpath No. 29B/1, commencing at footbridge approximately 227 metres north west of the junction with Risborough Road A4010. | The closure is required in the interest of public safety due to failure of a footbridge. | 12 March 2026 | 2 October 2026 |
| Public Footpath No.3 and No.33, Parish of Weston Turville | Weston Turville | Public Footpath No. 7/1, commencing approximately 420 metres north from the junction of WTU/2/1 & WTU/1/1 and continues along WTU/3/2 for the entire length and continues north west for the entire length of WTU/3/1 and continues north east along WTU/33/3 for approximately 620 metres. | The closure is required in the interest of public safety due to works taking place on the site. | 12 March 2026 | 2 October 2026 |
| Public Footpath No.5 and Public Bridleway No.6, Parish of Charndon | Charndon | Public Footpath, CHA/5/7, Parish of Charndon, for the entire length and Public Bridleway No. CHA/6(BW)/4 commencing at the junction with CHA/1/11 and continues east for the entire length of CHA/6/(BW)/4. | The closure is required in the interest of public safety due to a damaged bridge. | 18 March 2026 | 8 October 2026 |
|
Public Footpath No.7, Parish of Swanbourne and Public Footpath No.6, Parish of Hoggeston |
Swanbourne and Hoggeston | Public Footpath No. 7/1, commencing at Nearton Road and continuing south to the junction of HGT FP 8/1 & HGT FP 6/1. | The closure is required in the interest of public safety due to a damaged bridge. | 18 March 2026 | 8 October 2026 |
| Public Footpath No.7, Parish of Shabbington | Shabbington | Public Footpath No. 7, commencing at the junction of SHB FP 7/1 and Ickford Road and continuing north east for approximately 245 metres to the junction of SHB FP 7/1 and The Vine. | The closure is required in the interest of public safety to enable surface improvements. | 1 April 2026 | 1 October 2026 |
| Public Footpath No.2, Parish of Maids Moreton | Maids Moreton | Public Footpath No.2/1, commencing at the junction with Main Street and continuing Northeast for approximately 295 metres. | Public Safety to allow extensive ground works to be carried out by DWH | 24 April 2026 | 24 October 2026 |
| Public Footpath Nos.6 & 7, Parish of Drayton Beauchamp | Drayton Beauchamp | Public Footpath No’s. 6/2, 6/3 & 7/1, commencing at the junction of DBE/FP 6/1 & 6/2 and continuing east for the entire length of Footpath No’s 6/2, 6/3 & 7/1. | Damaged Bridge | 9 April 2026 | 9 October 2026 |
| Public Bridleway No.15 and No.11, Parish of Biddlesden and Lillingstone Dayrell |
Biddlesden and Lillingstone Dayrell |
Public Bridleway No’s. 15/1, 15/2, 11/1, 11/2 & 11/3, Parish of Biddlesden & Lillingstone Dayrell, commencing at the junction of Public Bridleway No. 15/1, Biddlesden with the Dadford to Silverstone Road (C18) continuing northeast to the junction of LID BW 11/3 and the county boundary. |
Public Safety due to Silverstone Events |
1 July 2026 27 August 2026 |
6 July 2026 31 August 2026 |
| Public Byway No.1, Parish of Longwick Cum Ilmer | Longwick cum Ilmer | Public Byway No. 1/1, Parish of Longwick-cum-Ilmer from the junction with Lower Icknield Way to a point 230 metres southeast of the junction with Lower Icknield Way. | Enable repairs to the surface of the Byway. | 30 December 2025 | 30 June 2026 |
| Public Footpath No.66, Parish of Bledlow Cum Saunderton | Bledlow Cum Saunderton | Public Footpath No.66/3, Parish of Bledlow Cum Saunderton, from the junction of Public Footpath No.9/1, No.11/1 and No.8/1 and continuing approximately 150 metres. | To allow the building of steps on the footpath to improve access. | 1 June 2026 | 1 December 2026 |
| Public Footpath No.6, Parish of Oakley | Oakley | Public Footpath No. 6/1, Oakley, from the junction of B4011 and OAK/FP/6/1 and continues south for the entire length of OAK/6/1. | The closure is required for public safety due to a failed bridge structure. | 10 June 2026 | 10 December 2026 |
| Public Footpath Nos.8 & 17, Parish of Mentmore | Mentmore | Public Footpath No’s. 8/1 & 17/1, Parish of Mentmore, from the junction of Public Footpath No. MEN/FP/8/1 and Garden House for the entire length, including MEN/FP/17/1. | The closure is required to enable ash dieback and mixed broadleaves thinning. | 24 June 2026 | 24 December 2026 |
| Public Footpath No.19, Parish of Ivinghoe | Ivinghoe | Public Footpath No’s. 19/1 & 19/2, Parish of Ivinghoe, from the junction of Public Footpath No. 19/1 and Beacon Road continuing north east for approximately 497 metres to Public Footpath No. 19/4. | The closure is required to allow demolition works on existing barn. | 1 July 2026 | 1 January 2027 |
| Public Byway Open to all Traffic No.1, Parish of Longwick Cum Ilmer |
Longwick Cum Ilmer |
Public Byway Open to all Traffic No. LCI/1/1, Parish of Longwick Cum Ilmer from the junction of Clebe Cottage & LCI/1/1, and continuing along LCI/1/1 for approximately 270 metres. | The closure is required to enable works to be carried out to resolve flooding issues in Horsenden village | 1 June 2026 | 1 December 2026 |
| Public Footpath No.17, Parish of Grendon Underwood | Grendon Underwood | Public Footpath No. 17/1, Parish of Grendon Underwood, from the junction of EDG/FP/11/1 & GUN/FP/17/1 continuing northeast for approximately 225 metres to the junction of EDG/FP/6/3 & GUN/FP/17/1. | The closure is required to allow for works to proceed in connection with approved development (application ref 21/02851/AOP) | 3 July 2026 | 3 January 2027 |
| Public Footpath No.11, Parish of Edgcott | Edgcott | Public Footpath No. 11/2, Parish of Edgcott, from the junction of Lawn Hill Road and EDG/FP/11/2, continuing south west to the junction of EDG/FP/6/3 & EDG/FP/11/2. |
The closure is required to allow for works to proceed in connection with the approved development (application ref 21/02851/AOP). |
3 July 2026 | 3 January 2027 |
| Public Footpath No.4, Parish of Downley and Public Footpath No.99, Parish of Hughenden | Downley and Hughenden | Public Footpath No.4, Parish of Downley and Public Footpath No.99, Parish of Hughenden, which commences at the junction with Hunts Lane and continues south to the junction of Public Footpath No.4, Parish of Downley | Facilitate Filming in Hunts Wood | 10 July 2026 | 10 July 2026 |