Planning application types and fees

Planning permission or consent

View our fees for applications for planning permission or consent.

These are applications where you're asking permission to:

  • carry out building works
  • change the use of a building
  • display advertisements
  • work on trees and hedges

This page also includes applications for:

  • car parks, service roads and access
  • the drilling of oil or natural gas
  • the winning and working of oil or natural gas

All fees are updated from 6 December 2023.

Householder

This application is for works or extension to a single dwelling (excludes flats). Only for householder developments.

Application type Fee
Householder £258

Outline planning permission

Outline planning permission with some or all matters reserved. Can be for minor or major developments.

Fees range from £578 to £202,500.

Outline application type Size of outline Fee
Erection of dwelling houses Outline permission for up to 0.5 hectares £578 per 0.1 hectare
Erection of dwelling houses Outline permission for between 0.5 hectares and 2.5 hectares £624 per 0.1 hectare
Erection of dwelling houses Outline permission for 2.6 hectares and over £15,433 plus £186 for each 0.1 hectares in excess of 2.5 hectares

Maximum total of £202,500
Erection of buildings Outline permission for up to 1 hectare £578 per hectare
Erection of buildings Outline permission for between 1 hectare and 2.5 hectares £624 per hectare
Erection of buildings Outline permission for 2.6 hectares and over £15,433 plus £186 for each 0.1 hectares in excess of 2.5 hectares

Maximum total of £202,500

Full planning permission

Applications for full planning permission. This can be for minor or major developments.

Fees vary from £120 to £405,000.

Full application type Application scheme Fee
Dwelling houses Alterations or extensions to a single dwellinghouse (or flat), including works within boundaries £258 for a single dwellinghouse (or single flat)
Dwelling houses Alterations or extensions to 2 or more dwellings (houses or flats), including works within boundaries £509
Dwelling houses New dwellings - up to 10 units £578 per dwelling
Dwelling houses New dwellings – between 10 and 50 units £624 per dwelling
Dwelling houses New dwellings – 50 units or more £30,860 + £186 for each additional dwellinghouse in excess of 50

Maximum fee of £405,000
Erection of buildings (not dwellings, agricultural, glasshouses, plant or machinery) No increase in gross (total) floor space to be created by development or no more than 40m2 £293
Erection of buildings (not dwellings, agricultural, glasshouses, plant or machinery) Between 40m2 and 1,000m2 gross floor space to be created by development £578 for each 75m2 (or part thereof)
Erection of buildings (not dwellings, agricultural, glasshouses, plant or machinery) Between 1,000m2 and 3,750m2 gross floorspace to be created by development £624 for each 75m2 (or part thereof)
Erection of buildings (not dwellings, agricultural, glasshouses, plant or machinery) More than 3,750m2 gross floorspace to be created by development £30,680 plus £186 for each additional 75m2 (or part thereof) in excess of 3,750m2

Maximum total of £405,000
Erection of buildings (on land used for agriculture for agricultural purposes) Increase in gross (total) floor space to be created by the development up to 465m2 £120
Erection of buildings (on land used for agriculture for agricultural purposes) Between 465m2 and 540m2 of gross floorspace to be created by the development £578
Erection of buildings (on land used for agriculture for agricultural purposes) Between 540m2 and 1,000m2 of gross floorspace to be created by the development £578 for the first 540m2
Plus £578 for each additional 75m2 (or part thereof) in excess of 540m2
Erection of buildings (on land used for agriculture for agricultural purposes) Between 1,000m2 and 4,215m2 of gross floorspace to be created by the development £624 for the first 1,000m2
Plus £624 for each additional 75m2 (or part thereof) in excess of 1,000m2
Erection of buildings (on land used for agriculture for agricultural purposes) More than 4,215m2 of gross floorspace to be created by the development £30,860 plus £186 for each additional 75m2 (or part thereof) in excess of 4,215m2

Maximum total of £405,000
Erection of glasshouses (on land used for the purpose of agriculture) No more than 465m2 gross (total) floorspace to be created by the development £120
Erection of glasshouses (on land used for the purpose of agriculture) Between 465m2 and 1,000 m2 gross floorspace to be created by the development £3,225
Erection of glasshouses (on land used for the purpose of agriculture) More than 1,000m2 gross floorspace to be created by the development £3,483
Erection/alterations/replacement of plant and machinery Site area no more than 1 hectare £578 for each 0.1 hectare (or part thereof)
Erection/alterations/replacement of plant and machinery Site area between 1 and 5 hectares £624 for each 0.1 hectare (or part thereof)
Erection/alterations/replacement of plant and machinery Site area more than 5 hectares £30,860 plus £186 for each 0.1 hectare (or part thereof) in excess of 5 hectares

Maximum total of £405,000
Involving more than one category of development N/A For a quote on the correct planning fee email [email protected]

Applications other than building works

Application type Application type/area Fee
Car park, service roads, or other accesses (for existing uses) For existing uses £293
Waste (Use of land for disposal of refuse or waste materials or deposit of material remaining after extraction or storage of minerals) Site area is no more than 15 hectares £316 for each 0.1 hectare (or part thereof)
Waste (Use of land for disposal of refuse or waste materials or deposit of material remaining after extraction or storage of minerals) Site area is more than 15 hectares £47,161 plus £186 for each additional hectare (or part thereof) in excess of 15 hectares

Maximum total of £105,300
Operations connected with exploratory drilling of oil or natural gas Site area is no more than 7.5 hectares £686 for each 0.1 hectare (or part thereof)
Operations connected with exploratory drilling of oil or natural gas Site area is more than 7.5 hectares £51,395 plus £204 for each 0.1 hectare (or part thereof) in excess of 7.5 hectares

Maximum total of £405,000
Operations (other than exploratory drilling) for the winning and working of oil or natural gas Site area is no more than 15 hectares £347 for each 0.1 hectare (or part thereof)
Operations (other than exploratory drilling) for the winning and working of oil or natural gas Site area is more than 15 hectares £52,002 plus £204 for each 0.1 hectare (or part thereof) in excess of 15 hectares

Maximum total of £105,300
Other operations (winning and working of minerals) excluding oil and natural gas Site area is no more than 15 hectares £316 for each 0.1 hectare (or part thereof)
Other operations (winning and working of minerals) excluding oil and natural gas Site area is more than 15 hectares £47,161 plus £186 for each 0.1 hectare in excess of 15 hectares

Maximum total of £405,000
Other operations (not coming within any of the above categories) Miscellaneous £293 for each 0.1 hectare (or part thereof)

Maximum total of £2,535

Adverts are grouped into three categories:

  • exceptions – advertisements that do not require advertisement consent
  • deemed consent – those advertisements that require consent, but provided they fall within certain criteria can be displayed without having to apply to the local planning authority
  • express consent – an application for express consent must be made to the local planning authority on the forms provided and is subject to a fee

Applications for advertisement consent can be considered only in the interests of 'amenity' and 'public safety'.

We may not impose any limitation or restriction on the subject matter, content or design of an advertisement, except in the interests of public safety or amenity.

Application type Fee
Consent to display an advertisement relating to the business on the premises £165
Consent to display advance signs which are not situated on or visible from the site, directing the public to a business £165
Consent to display an advertisement – other £578

Change of use

The use of land and buildings is split into various categories known as 'use classes'. A 'change of use' can occur within the same use class or from one use class to another.

Below are the application fees for:

  • the change of use of a building to 1 or more separate dwellinghouses
  • other changes of use of a building or land
Type Fee
No more than 10 dwellinghouses £578 per dwelling
Between 10 and 50 dwellinghouses £624 per dwelling
More than 50 total dwellinghouses £30,860 plus £186 for each unit in excess of 50

Maximum total of £405,000
Other changes of use of a building or land £578

Other application types

Includes:

  • listed building consent
  • tree works
  • permission in principle
  • lawful development certificates
  • minerals and waste
Application type Fee
Permission in principle – an alternative route to permission, but must meet certain requirements £503 per 0.1 hectare of land
Listed building consent – consent for alterations or demolition of a listed building Exempt from fees
Lawful development certificate (existing) – for an existing use or operation or activity £293 or relevant full application fee
Lawful development certificate (proposed) – for a proposed use or operation or activity 50% of full application fee
Approval of reserved matters – following outline approval Full application fee or £578 if already paid
Removal or variation of condition – removal or variation of a condition following grant of planning permission £293
Approval of details reserved by condition – approval of details reserved by condition £43 per request (householder)
£145 per request (other)
Technical details consent – submission of technical details relating to a permission in principle Full application fee
Non-material amendment – amend an application that has already been determined £43 (householder)
£293 (other)
Application for tree works – works to trees subject to a preservation order (TPO) or in a Conservation Area Exempt from fees