Check for roadworks and closures
You can view the interactive map to see all roadworks, including roadworks being done by:
- Buckinghamshire Council
- approved utility and contractual works
- emergency works
Using the interactive map
Enter a postcode or zoom into an area on the map that you want to view.
The map will default to show you roadworks currently in progress. Planned works will not appear on the map until they've started.
To see roadworks planned for the future, change the selection in the dropdown menu at the top of the map.
Our planned road works
View a list of our planned roadworks over the next few weeks below.
There will be no weekend or bank holiday working unless specified.
This list doesn't include all roadworks
This list only shows planned improvements and repairs being made by Buckinghamshire Council.
View the interactive map to see all roadworks, including utility works.
Last updated on Thursday 25 July.
Location of works | Date | Description of works to be carried out |
---|---|---|
Berkhampstead Road, Chesham | Thursday 25 July to Monday 12 August | Conventional resurfacing works using a road closure in operation 8pm to 6am |
Location of works | Date | Description of works to be carried out |
---|---|---|
Marsh Lane, Taplow | Monday 22 July to Friday 2 August | Plane and Patch works using a road closure in operation 7am to 7pm |
Location of works | Date | Description of works to be carried out |
---|---|---|
London Road, Aston Clinton | Tuesday 2 April to Tuesday 20 August | Traffic Calming works using a combination of both two-way and three-way temporary traffic lights in operation between 8am and 5pm |
Castlefields, High Wycombe
Monday 29 July to Friday 6 December.
Traffic Calming works using a Road Closure in operation Monday to Friday from 7:30 am to 5:30pm and Saturday 8am to 4pm.
The works will be carried out in the following places:
Location of works | Date | Part of road closed |
---|---|---|
The Middleway | 29 July to 13 August 2024 | Rutland Avenue to Rowliff Road |
Rutland Avenue | 14 August to 30 August 2024 | Laburnum Rd to Rutland Avenue |
Rutland Avenue | 2 September to 18 September 2024 | Copyground Lane to Booker Lane |
Spearing Road | 19 September to 18 October 2024 | Cross Road to Rutland Avenue |
Rutland Avenue | 21 October to 25 October 2024 | Outside Mosque |
Rutland Avenue | 28 October to 1 November 2024 | Albion Road to Laburnum Road |
Rutland Avenue junction with Cross Road | 4 November to 29 November 2024 | - |
Whitelands Road | 2 December to 3 December 2024 | - |
Spearing Road | 4 December 2024 | - |
Rutland Avenue | 5 December to 6 December 2024 | The Middleway to Cross Road |
These works will start on the dates below, followed by various days of sweeping to clear the loose stones. Then further time to reinstall the road markings. These works will take place over a 2 to 3 week period.
Location of works | Date works to be carried out | Description of works to be carried out |
---|---|---|
B4009 Lower Icknield Way | Monday 29 July | Stud installation works following the Surface Dressing Headline Treatment Works using a road closure in place 8pm to 6am |
A413 Amersham Road, Chalfont St Giles | Wednesday 31 July | Stud installation works following the Surface Dressing Headline Treatment Works using a road closure in place 8pm to 5am |
Hitcham Lane, Burnham | Monday 29 July | Surface Dressing Headline Treatment works using a road closure in place 7am to 7pm |
Brays Lane, Hyde Heath | Monday 29 July | Surface Dressing Headline Treatment works using a road closure in place 7am to 7pm |
The headline treatment for this programme will commence on the dates below. Followed by sweeping to clear the loose stones after one week.
Ironwork adjustments and road markings will be carried out two weeks after the surface treatment.
Location of works | Date works to be carried out | Description of works to be carried out |
---|---|---|
York Place, Aylesbury | Monday 29 July | Micro-Surfacing Headline Treatment Works using a road closure in place 8:30am to 5:30pm |
Northern Road, Aylesbury | Monday 29 July to Tuesday 30 July | Micro-Surfacing Headline Treatment Works using a road closure in place 8:30am to 5:30pm |
Wood Lane Close, Iver | Wednesday 31 July | Micro-Surfacing Remedial Works using a road closure in place 8:30am to 5:30pm |
Boundary Road, Wooburn Green | Wednesday 31 July to Thursday 1 August | Micro-Surfacing Remedial Works using a road closure in place 9:30am to 2pm |
Lock Road, Marlow | Thursday 1 August | Micro-Surfacing Remedial Works using a road closure in place 9:30am to 3:30pm |
Mill Road, Marlow | Thursday 1 August to Friday 2 August) | Micro-Surfacing Remedial Works using a road closure in place 9:30am to 3:30pm |
Location of works | Date works to be carried out | Description of works to be carried out |
---|---|---|
Stock Road, Whaddon | Tuesday 16 July to Thursday 1 August | Road lining works using a stop & go traffic management in place 9:30am to 3:30pm |
Swanbourne Road, Swanbourne | Monday 22 July to Tuesday 6 August | Road lining works using a road closure traffic management in place 6pm to 6am |
Mursley Road/Stewkley | Tuesday 23 July to Tuesday 6 August | Road lining works using a road closure traffic management in place 6pm to 6am |
A355 Amersham to Beaconsfield | Friday 2 August to Friday 16 August | Road lining works using a road closure traffic management in place 6pm to 6am |
B4032 High Street Stewkley | Monday 29 August to Monday 12 August | Road lining works using a road closure traffic management in place 6pm to 6am |
Location of works | Date | Description of works to be carried out |
---|---|---|
Ellen Road, Aylesbury | Monday 22 July to Friday 30 August | Footway improvement works using phased footway closures and stop and go traffic management in place 8am to 6pm |
A355 Amersham Road, Beaconsfield | Wednesday 17 July to Friday 16 August |
Footway improvement works 17 July to 26 July: Works to be undertaken using road narrows and localised traffic management in place 8am to 6pm. 29 July to 17 August: Works to be undertaken using multi-way traffic lights in place 8am to 6pm |
Location of works | Date | Description of works to be carried out |
---|---|---|
Five Points Roundabout (Wood Lane) | Monday 15 July to Friday 16 August | Drainage Improvement works using a 24/7 road closure. |
Location of works | Date | Description of works to be carried out |
---|---|---|
A40 Abbey Way Elevated Road/Eden Centre Package 2 for combined 4 Units – Clarks, Warren James, Supercuts and Card Factory |
Monday 1 July to Friday 2 August | Localise carriageway repairs including waterproofing and gully work over the structure to prevent further seepage/leakage to shops below. Works to be carried out behind existing red/white traffic protection barrier between 7:30am to 5:30pm |
Some activities are weather dependent and dates are subject to change at short notice.
These dates may also be subject to change depending on the availability of materials and unforeseen circumstances out of our control. We apologise in advance for any inconvenience caused.
Road worker abuse has increased this year – please respect our workforce while they make improvements to Buckinghamshire Highways
If roadwork signs have been left behind
If roadworks have finished but there is some signage that has been left behind at the site, report the location of the signs on FixMyStreet.