Environmental permit for a biomass boiler in Wing
We have received a proposal for an environmental permit to operate a biomass boiler in Wing. A biomass boiler is a Small Waste Incineration Plant (SWIP).
The permit was submitted under the Environmental Permitting (England & Wales) Regulations 2016, Schedule 13A.
The application was made by Hillgreen Engineering Ltd for and on behalf of Brackley Farms Limited.
The proposed location
Wing Complex
Leighton Buzzard
Wing
Buckinghamshire
LU7 0LD
View the documents
View the application documents:
- Air Dispersion Modelling (PDF, 8.5 MB)
- Air Quality Assessment (PDF, 5.56 MB)
- Duly Made Pause Status of Application (PDF, 323 KB)
- Environmental Permitting Enquiry (PDF, 86 KB)
- Environmental Permitting PG Note (PDF, 468 KB)
- Flow Chart SD3 3MW (PDF, 87 KB)
- Management System Summary (PDF, 895 KB)
- Map & Permit Boundary (PDF, 1.39 MB)
- Stack Emissions Monitoring Report (PDF, 976 KB)
- SWIP Application Form (PDF, 448 KB)
- Site Drawing (PDF, 4.96 MB)
Contact us
Email: [email protected]