Local highways maintenance transparency report

Last updated: 23 June 2025

Work completed in 2024/25

The following work was completed during 2024/25:

  • surface dressing: 220,000 m² (equivalent to 31 football pitches)
  • micro surfacing: 40,000 m² (almost 6 football pitches)
  • resurfacing: 229,000 m² (32 football pitches)
  • reconstruction: 56,089 m² (almost 8 football pitches)
  • plane and patch: 147,000 m² (almost 21 football pitch