Fees for Highways Development Management

Fees for planning services

Our fees for planning services (before you start construction):

Planning Performance Agreement (PPA) fees

Officer time is charged at £169 (billed retrospectively).

Caps on fees will be considered where appropriate and monitored to ensure control of spend.

The overall cost is dependent on the scale of development and level of input from officers. Time will only be charged for hours spent.

Pre-application advice fees

Residential developments
Number of dwellings Fee (includes VAT)
Householder £257
1 dwelling £579.40
2 to 9 dwellings (new or converted) £1,011
10 to 24 dwellings £1,637.55
25 to 199 dwellings £3,626.70
200 to 249 dwellings £6,744
250 to 600 dwellings £9,877
601+ dwellings £12,500
Non-residential developments
Size of development Fee (includes VAT)
Up to 100sqm £617.95
101sqm to 500sqm £1,011
501sqm to 1000sqm £1,685.70
1001sqm to 5000sqm £3,626.70
5001sqm to 10,000sqm £6,744
10,001sqm to 20,999sqm £9,877
Over 30,000sqm £12,500

Fees are inclusive of VAT.

For mixed-use sites, we will add half of the lower category fee to the higher category fee to calculate the total cost.

Strategic Model Review fees

Model runs are bespoke, and costs vary dependent on scenarios and data output.

The scope of strategic modelling is to be agreed with the Highway Authority before commencement.

View fees for accessing our strategic transport models.

Developer Microsimulation Model Reviews

There is a fee for developers to review models such as VISSIM and SATURN. A fee of 20% of consultancy costs applies and covers the administrative costs incurred by the council.

Fees for agreements, licences and assistance

Our fees for other services:

Section 38 and Section 278 fees

These exclude street lighting and structure fees.

Section 38 and 278 licences will cost whichever is larger of either:

  • £5,000
  • 12% of the total cost of the value of the engineering (including statutory undertakers works, any traffic signal installations and street lighting)

You will need to pay £5,000 up front before any work has been started.

Fees over the minimum to be collected on completion of the agreement or as otherwise may be agreed.

Transportation fees on engineering works over £500,000 are to be calculated as below:

  • reduce rate to 9% for element of works costs between £500,000 and £1,500,000
  • reduce rate to 6% for element of works costs between £1,500,000 and £2,000,000
  • reduce rate to 4% for element of works costs more than £2,000,000

Section 184 licence

A section 184 licence costs £2,468.55.

Street lighting fees

Up to 500 metres of adopted carriageway or footway:

Service Section 38 lighting Section 278 lighting Each additional 1,000 metres (or part thereof)
Design brief (including 2 design checks) £1,549.13 £2,191.03 £623.50
Final works (including 2 inspections) £1,037.94 £1,037.94 £172.55
Total fee £2,587.07 £3,228.97
Additional reviews and inspections
Service Section 38 lighting Section 278 lighting Each additional 1,000 metres (or part thereof)
Additional technical reviews £448.16 £448.30 £236.94
Additional inspections £379.40 £379.40 £47.42

Structure fees

Our fee for a standard agreement in principle submission technical approval (in accordance with CG300) is £5,012.72, which includes:

  • 2 technical design reviews
  • 1 review of your design certificate and construction completion certificate
  • collation of asset management documentation
  • updating asset management system

Fees for complex structures are decided on a case-by-case basis.

View additional fees below:

Service Fee
Additional technical review £539.23
Inspection £6,866.66

Commuted sums

View our commuted sums below:

Service or feature Fee
Non-chambered gulley connections £350 each
Pedestrian or cyclist crossings £23,000
Signalised junctions £46,500 per controller
Soakaways, hydro brakes or petrol interceptors £5,000 each
Street lighting or illuminated traffic signs £440 per item
Structures Decided on an individual basis, using the Adept Commuted Sum Calculator
Surface treatments Decided on a case-by-case basis, where the treatment differs from our standard specification
Trees £500 each

Road space booking and permits fee

Our fee is £270.20.

Highway Tree Replacement

Any highway trees that the developer wishes to remove must be agreed in advance with us. A fee of £5000 per tree must be paid for the replacement and maintenance of the tree.

Traffic Regulation Orders (TRO) and consultations

View the fees below:

Size Fee
Small £12,417.70
Medium £16,513.53
Large Bespoke

Other consultations

£10,000 deposit, with any unused monies refunded.

Examples of other consultations include controlled crossing points and traffic calming features.

Emergency Traffic Management Maintenance Contribution

The fee for Emergency Traffic Management Maintenance Contribution is £10,000.

Traffic System fees

Traffic System fees include costs associated with toucan crossings, signal controlled crossings, CCTV etc.

These fees cover both Technical Approval and Inspections.

Our Internal Traffic Systems team will provide a cost estimate. Turnaround time for this will be advised once the initial request is made.

These fees will need to be paid before the Technical Review.